Sub organisation
Building Digital UK
Current ministers, official publications and departmental history, exactly as published.
§ Ministers
Recorded ministerial post holdings
0 recorded
No ministerial post holdings are recorded against this organisation's official GOV.UK URL yet.
§ Consultations
Consultations and government responses
116 recorded
Government response · 2026-06-23
UK Gigabit Programme: Kent Public Review
Government response · 2026-06-23
Project Gigabit: Nottinghamshire and West of Lincolnshire Public Review
Government response · 2026-06-23
UK Gigabit Programme: Norfolk Public Review
Government response · 2026-06-23
UK Gigabit Programme: Hampshire and Isle of Wight Public Review
Government response · 2026-06-23
Project Gigabit Programme: Suffolk Public Review
Government response · 2026-06-23
Project Gigabit : East Sussex Public Review
Government response · 2026-06-23
Project Gigabit: Bedfordshire, Northamptonshire and Milton Keynes Public Review
Government response · 2026-06-23
Project Gigabit: Leicestershire and Warwickshire Public Review
Government response · 2026-06-23
Project Gigabit: West Sussex Public Review
Government response · 2026-06-23
UK Gigabit Programme: Cambridgeshire Public Review
Government response · 2026-06-23
UK Gigabit Programme: Buckinghamshire, Hertfordshire and East of Berkshire Public Review
Government response · 2026-06-10
Project Gigabit National Rolling Open Market Review January 2026
Government response · 2026-06-01
Project Gigabit National Rolling Open Market Review May 2026
Government response · 2026-01-14
Project Gigabit - Cheshire (Lot 17) Public Review
Government response · 2026-01-08
Project Gigabit National Rolling Open Market Review September 2025
Government response · 2025-09-12
Project Gigabit National Rolling Open Market Review May 2025
Government response · 2025-07-01
Project Gigabit National Rolling Open Market Review January 2025
Government response · 2025-01-30
Project Gigabit National Rolling Open Market Review September 2024
Government response · 2025-01-08
Project Gigabit: Durham, Tyneside and Teesside and Northumberland Public Review
Government response · 2024-10-17
Project Gigabit National Rolling Open Market Review May 2024
Government response · 2024-09-05
Project Gigabit National Rolling Open Market Review January 2023
Government response · 2024-07-30
Project Gigabit National Rolling Open Market Review January 2024
Government response · 2024-04-25
Project Gigabit National Rolling Open Market Review September 2023
Government response · 2024-03-18
Shared Rural Network consultation
Government response · 2023-10-11
Project Gigabit - Lincolnshire (including north-east Lincolnshire and north Lincolnshire) and East Riding (Lot 23) Public Review
Government response · 2023-10-09
UK Gigabit Programme: Lancashire Public Review
Government response · 2023-10-06
UK Gigabit Programme: Surrey Public Review
Government response · 2023-10-06
Project Gigabit National Rolling Open Market Review May 2023
Government response · 2023-09-08
Project Gigabit - Newcastle and North Tyneside (Lot 38) Public Review
Government response · 2023-09-08
Project Gigabit - Greater London (Lot 37) Public Review
Government response · 2023-09-08
Project Gigabit - Birmingham and the Black Country (Lot 35) Public Review
Government response · 2023-09-08
Project Gigabit - Merseyside and Greater Manchester (Lot 36) Public Review
Government response · 2023-09-08
Project Gigabit - Essex (Lot 21) Public Review
Government response · 2023-08-29
Project Gigabit - Mid/East Devon and West Somerset (Lot 6) Public Review
Government response · 2023-08-10
Project Gigabit Programme: Derbyshire Public Review
Government response · 2023-08-04
Project Gigabit - North Yorkshire (Lot 31) Public Review
Government response · 2023-08-02
Project Gigabit - West Herefordshire and Forest of Dean (Lot 15) Public Review
Government response · 2023-08-02
Project Gigabit - East Gloucestershire (Lot 18) Public Review
Government response · 2023-07-14
UK Gigabit Programme: Staffordshire Public Review
Government response · 2023-07-14
Project Gigabit - Cornwall and Isles of Scilly (Lot 32) Public Review
Closed consultation · 2023-06-06
Northern Ireland Project Gigabit Public Review - request for information
Government response · 2023-05-31
Project Gigabit - Dorset and South Somerset (Lot 14) Public Review
Government response · 2023-05-16
Project Gigabit Programme: Shropshire Public Review
Government response · 2023-04-26
Project Gigabit Programme: West Yorkshire and York area Public Review
Government response · 2023-04-26
Project Gigabit Programme: South Yorkshire Public Review
Government response · 2023-03-31
Inverness and Highland City-Region Deal: Digital Project Public Review
Government response · 2023-03-24
UK Gigabit Programme: Oxfordshire and West Berkshire Public Review
Government response · 2023-03-24
Project Gigabit National Rolling Open Market Review September 2022
Closed consultation · 2023-03-23
Broadband infrastructure in Scotland: Public Review
Government response · 2023-02-07
Project Gigabit: Wiltshire and South Gloucestershire (inc Swindon) Public Review
Government response · 2022-12-29
Project Gigabit National Rolling Open Market Review May 2022
Closed consultation · 2022-12-13
Project Gigabit: Open Market Review request for information - Northern Ireland
Government response · 2022-11-16
Project Gigabit: public review request for information - Wales
Government response · 2022-09-28
UK Gigabit Programme: Worcestershire Public Review
Government response · 2022-07-08
UK Gigabit Programme: Cornwall and Isles of Scilly Public Review
Government response · 2022-07-08
UK Gigabit Programme: Dorset Public Review
Closed consultation · 2022-07-06
UK Gigabit Programme: Essex Public Review
Government response · 2022-07-06
UK Gigabit Programme: Cumbria Public Review
Government response · 2022-05-06
Project Gigabit: Open Market Review request for information - First Release of Phase 3
Government response · 2022-02-15
Project Gigabit National Rolling Open Market Review January 2022
§ Publications
Other official publications
111 recorded
Transparency release · 2026-07-20
Premises contracted and built, Project Gigabit contracts
Government response · 2026-06-23
UK Gigabit Programme: Kent Public Review
Government response · 2026-06-23
Project Gigabit: Nottinghamshire and West of Lincolnshire Public Review
Government response · 2026-06-23
UK Gigabit Programme: Norfolk Public Review
Government response · 2026-06-23
UK Gigabit Programme: Hampshire and Isle of Wight Public Review
Government response · 2026-06-23
Project Gigabit Programme: Suffolk Public Review
Government response · 2026-06-23
Project Gigabit : East Sussex Public Review
Government response · 2026-06-23
Project Gigabit: Bedfordshire, Northamptonshire and Milton Keynes Public Review
Government response · 2026-06-23
Project Gigabit: Leicestershire and Warwickshire Public Review
Government response · 2026-06-23
Project Gigabit: West Sussex Public Review
Government response · 2026-06-23
UK Gigabit Programme: Cambridgeshire Public Review
Government response · 2026-06-23
UK Gigabit Programme: Buckinghamshire, Hertfordshire and East of Berkshire Public Review
Official statistics · 2026-06-11
BDUK delivery performance, annual: April 2025 to March 2026
Government response · 2026-06-10
Project Gigabit National Rolling Open Market Review January 2026
Transparency release · 2026-06-04
January 2026 OMR and premises in BDUK plans (England and Wales)
Government response · 2026-06-01
Project Gigabit National Rolling Open Market Review May 2026
Guidance · 2026-03-16
Gigabit Broadband Voucher Scheme information
Official statistics · 2026-02-19
BDUK delivery performance, quarterly: October 2025 to Dec 2025
Transparency release · 2026-02-02
September 2025 OMR and premises in BDUK plans (England and Wales)
Research · 2026-01-15
Mobile Supplier Additionality Research
Research · 2026-01-15
The Benefits and Challenges of 4G Connectivity in Rural Scotland
Research · 2026-01-15
Shared Rural Network Wellbeing Survey
Government response · 2026-01-14
Project Gigabit - Cheshire (Lot 17) Public Review
Government response · 2026-01-08
Project Gigabit National Rolling Open Market Review September 2025
Research · 2025-12-24
Quality and methodology information (QMI): Shared Rural Network
Official statistics · 2025-11-13
BDUK delivery performance, quarterly: April 2025 to Sept 2025
Transparency release · 2025-11-11
Register of interests for Building Digital UK Board
Corporate report · 2025-10-22
Building Digital UK Annual Report and Accounts 2024 to 2025
Transparency release · 2025-09-12
May 2025 OMR and premises in BDUK plans (England and Wales)
Government response · 2025-09-12
Project Gigabit National Rolling Open Market Review May 2025
Official statistics · 2025-09-04
BDUK delivery performance, annual: April 2024 to March 2025
Research · 2025-08-14
Shared Rural Network Evaluation Plan
Research · 2025-08-14
BDUK Hubs Evaluation Plan
Research · 2025-08-14
Local Full Fibre Network Evaluation Plan
Research · 2025-08-14
Project Gigabit Evaluation Plan
Official statistics · 2025-07-23
BDUK delivery performance, quarterly: April 2024 to December 2024
Government response · 2025-07-01
Project Gigabit National Rolling Open Market Review January 2025
Transparency release · 2025-07-01
January 2025 OMR and premises in BDUK plans (England and Wales)
Transparency release · 2025-03-13
Premises in BDUK plans (March 2025, England and Wales)
Research · 2025-03-11
Superfast Broadband Programme Evaluation: Benefits and Impacts
Government response · 2025-01-30
Project Gigabit National Rolling Open Market Review September 2024
Research · 2025-01-13
Gigabit Infrastructure Subsidy (GIS) Early Process Evaluation
Government response · 2025-01-08
Project Gigabit: Durham, Tyneside and Teesside and Northumberland Public Review
Transparency release · 2024-12-13
Supporting information: BDUK's annual report 2023 to 2024
Corporate report · 2024-12-13
Building Digital UK annual report and accounts 2023 to 2024
Research · 2024-11-27
Beyond the digital divide
Research · 2024-11-27
From Digital Infrastructure to Digital Inclusion
Policy paper · 2024-11-27
Project Gigabit progress update – November 2024
Government response · 2024-10-17
Project Gigabit National Rolling Open Market Review May 2024
Policy paper · 2024-09-12
Shared Rural Network (SRN) progress update - September 2024
Government response · 2024-09-05
Project Gigabit National Rolling Open Market Review January 2023
Government response · 2024-07-30
Project Gigabit National Rolling Open Market Review January 2024
Government response · 2024-04-25
Project Gigabit National Rolling Open Market Review September 2023
Corporate report · 2024-04-09
BDUK Corporate Plan 2024 to 2025
Research · 2024-04-09
Connecting gigabit communities: Revisiting rural schools
Policy paper · 2024-04-09
Project Gigabit progress update - April 2024
Government response · 2024-03-18
Shared Rural Network consultation
Policy paper · 2023-12-15
Project Gigabit progress update, December 2023
Research · 2023-12-14
BDUK school benefit survey results
Research · 2023-12-14
Local Full Fibre Networks Programme wave one final evaluation
§ Timeline
Departmental lifecycle events
227 recorded
- 2026-07-20 · publicationPremises contracted and built, Project Gigabit contractsBuilding Digital UK (BDUK) reports on premises contracted and built under Project Gigabit contracts.GOV.UK Search API ↗
- 2026-06-23 · government_responseProject Gigabit : East Sussex Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the East Sussex project area.GOV.UK Search API ↗
- 2026-06-23 · government_responseProject Gigabit: Bedfordshire, Northamptonshire and Milton Keynes Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Bedfordshire, Northamptonshire and Milton Keynes area.GOV.UK Search API ↗
- 2026-06-23 · government_responseProject Gigabit: West Sussex Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the West Sussex area. This consultation closes at 5pm on Friday 4 March 2022.GOV.UK Search API ↗
- 2026-06-23 · government_responseProject Gigabit: Nottinghamshire and West of Lincolnshire Public ReviewNew procurement to extend coverage of gigabit-capable broadband across Nottinghamshire and West of Lincolnshire area.GOV.UK Search API ↗
- 2026-06-23 · government_responseUK Gigabit Programme: Cambridgeshire Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Cambridgeshire project area.GOV.UK Search API ↗
- 2026-06-23 · government_responseUK Gigabit Programme: Kent Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Kent project area.GOV.UK Search API ↗
- 2026-06-23 · government_responseUK Gigabit Programme: Norfolk Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Norfolk area.GOV.UK Search API ↗
- 2026-06-23 · government_responseUK Gigabit Programme: Buckinghamshire, Hertfordshire and East of Berkshire Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Buckinghamshire, Hertfordshire and East of Berkshire areas. This consultation closes at 5pm on Friday 4 March 2022.GOV.UK Search API ↗
- 2026-06-23 · government_responseProject Gigabit: Leicestershire and Warwickshire Public ReviewNew procurement to extend coverage of gigabit-capable broadband across Leicestershire and Warwickshire.GOV.UK Search API ↗
- 2026-06-23 · government_responseProject Gigabit Programme: Suffolk Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Suffolk area.GOV.UK Search API ↗
- 2026-06-23 · government_responseUK Gigabit Programme: Hampshire and Isle of Wight Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Hampshire and Isle of Wight area.GOV.UK Search API ↗
- 2026-06-11 · publicationBDUK delivery performance, annual: April 2025 to March 2026Breakdowns of how many premises in the UK have received gigabit-capable broadband coverage as a result of Building Digital UK (BDUK) subsidy.GOV.UK Search API ↗
- 2026-06-10 · government_responseProject Gigabit National Rolling Open Market Review January 2026A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3 year period across the UK.GOV.UK Search API ↗
- 2026-06-04 · publicationJanuary 2026 OMR and premises in BDUK plans (England and Wales)January 2026 Open Market Review (OMR) and premises in Building Digital UK (BDUK) plans (England and Wales)GOV.UK Search API ↗
- 2026-06-01 · consultation_closedProject Gigabit National Rolling Open Market Review May 2026GOV.UK Content API ↗
- 2026-06-01 · government_responseProject Gigabit National Rolling Open Market Review May 2026A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3 year period across the UK.GOV.UK Search API ↗
- 2026-05-01 · consultation_openedProject Gigabit National Rolling Open Market Review May 2026GOV.UK Content API ↗
- 2026-03-16 · publicationGigabit Broadband Voucher Scheme informationThis page contains information about the scheme, including how it works, eligibility criteria, and how to access the funding available.GOV.UK Search API ↗
- 2026-02-19 · publicationBDUK delivery performance, quarterly: October 2025 to Dec 2025Breakdowns of how many premises in the United Kingdom have received gigabit-capable broadband coverage as a result of Building Digital UK (BDUK) subsidy.GOV.UK Search API ↗
- 2026-02-06 · consultation_closedProject Gigabit National Rolling Open Market Review January 2026GOV.UK Content API ↗
- 2026-02-02 · publicationSeptember 2025 OMR and premises in BDUK plans (England and Wales)BDUK’s current view at premises level of September 2025 OMR determinations, current connectivity, future commercial plans, and premises in BDUK interventionsGOV.UK Search API ↗
- 2026-01-15 · publicationMobile Supplier Additionality ResearchAn investigation into the relationship between the number of available mobile networks in a location and the resulting benefits of mobile connectivity.GOV.UK Search API ↗
- 2026-01-15 · publicationThe Benefits and Challenges of 4G Connectivity in Rural ScotlandA qualitative exploration of the benefits and disbenefits of mobile connectivity and the required infrastructure in rural areas.GOV.UK Search API ↗
- 2026-01-15 · publicationShared Rural Network Wellbeing SurveyThe results of a wellbeing and social benefits survey conducted with beneficiaries of the Shared Rural Network programme.GOV.UK Search API ↗
- 2026-01-14 · government_responseProject Gigabit - Cheshire (Lot 17) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Cheshire area. This consultation closes at 5pm on Wednesday 5 October 2022.GOV.UK Search API ↗
- 2026-01-08 · government_responseProject Gigabit National Rolling Open Market Review September 2025A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3 year period across the UK.GOV.UK Search API ↗
- 2026-01-06 · consultation_openedProject Gigabit National Rolling Open Market Review January 2026GOV.UK Content API ↗
- 2025-12-24 · publicationQuality and methodology information (QMI): Shared Rural NetworkThis document is intended to support Shared Rural Network data releases, providing information on how coverage figures were generated.GOV.UK Search API ↗
- 2025-11-13 · publicationBDUK delivery performance, quarterly: April 2025 to Sept 2025Breakdowns of how many premises in the United Kingdom have received gigabit-capable broadband coverage as a result of Building Digital UK (BDUK) subsidy.GOV.UK Search API ↗
- 2025-11-11 · publicationRegister of interests for Building Digital UK BoardA register of interests declared by Building Digital UK (BDUK) Board members.GOV.UK Search API ↗
- 2025-10-22 · publicationBuilding Digital UK Annual Report and Accounts 2024 to 2025The annual accounts provide a financial and narrative summary of the activities of Building Digital UK for the year 2024 to 2025.GOV.UK Search API ↗
- 2025-10-01 · consultation_closedProject Gigabit National Rolling Open Market Review September 2025GOV.UK Content API ↗
- 2025-09-12 · government_responseProject Gigabit National Rolling Open Market Review May 2025A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3 year period across the UK.GOV.UK Search API ↗
- 2025-09-12 · publicationMay 2025 OMR and premises in BDUK plans (England and Wales)BDUK’s current view at premises level of May 2025 OMR determinations, current connectivity, future commercial plans, and premises in BDUK interventionsGOV.UK Search API ↗
- 2025-09-04 · publicationBDUK delivery performance, annual: April 2024 to March 2025Breakdowns of how many premises in the United Kingdom have received gigabit-capable broadband coverage as a result of Building Digital UK (BDUK) subsidy.GOV.UK Search API ↗
- 2025-09-01 · consultation_openedProject Gigabit National Rolling Open Market Review September 2025GOV.UK Content API ↗
- 2025-08-14 · publicationBDUK Hubs Evaluation PlanThis publication sets out the plan for the remaining evaluation activity of BDUK's Hub intervention. It covers the work planned between 2024 and 2027.GOV.UK Search API ↗
- 2025-08-14 · publicationShared Rural Network Evaluation PlanThe recommended approach to the full evaluation of the Shared Rural Network Programme.GOV.UK Search API ↗
- 2025-08-14 · publicationProject Gigabit Evaluation PlanThis report sets out the evaluation of Project Gigabit, including the Gigabit Infrastructure Subsidy (GIS) and the Gigabit Broadband Voucher Scheme (GBVS).GOV.UK Search API ↗
- 2025-08-14 · publicationLocal Full Fibre Network Evaluation PlanThis evaluation plan outlines the framework and methodologies that will guide the evaluation of the Local Full Fibre Networks (LFFN) programme.GOV.UK Search API ↗
- 2025-07-23 · publicationBDUK delivery performance, quarterly: April 2024 to December 2024Breakdowns of how many premises in the United Kingdom have received gigabit-capable broadband coverage as a result of Building Digital UK (BDUK) subsidy.GOV.UK Search API ↗
- 2025-07-01 · government_responseProject Gigabit National Rolling Open Market Review January 2025A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3 year period across the UK.GOV.UK Search API ↗
- 2025-07-01 · publicationJanuary 2025 OMR and premises in BDUK plans (England and Wales)BDUK’s current view at premises level of January 2025 OMR determinations, current connectivity, future commercial plans, and premises in BDUK interventionsGOV.UK Search API ↗
- 2025-06-02 · consultation_closedProject Gigabit National Rolling Open Market Review May 2025GOV.UK Content API ↗
- 2025-05-01 · consultation_openedProject Gigabit National Rolling Open Market Review May 2025GOV.UK Content API ↗
- 2025-03-13 · publicationPremises in BDUK plans (March 2025, England and Wales)This data provides BDUK’s current view at a premises level of current connectivity, future commercial plans, and premises in BDUK interventions.GOV.UK Search API ↗
- 2025-03-11 · publicationSuperfast Broadband Programme Evaluation: Benefits and ImpactsAn overview of the key economic, social, and environmental benefits of the Superfast Broadband Programme.GOV.UK Search API ↗
- 2025-02-13 · consultation_closedProject Gigabit National Rolling Open Market Review January 2025GOV.UK Content API ↗
- 2025-01-30 · government_responseProject Gigabit National Rolling Open Market Review September 2024A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3 year period across the UK.GOV.UK Search API ↗
- 2025-01-13 · consultation_openedProject Gigabit National Rolling Open Market Review January 2025GOV.UK Content API ↗
- 2025-01-13 · publicationGigabit Infrastructure Subsidy (GIS) Early Process EvaluationThe findings of an early process evaluation of GIS intervention activityGOV.UK Search API ↗
- 2025-01-08 · government_responseProject Gigabit: Durham, Tyneside and Teesside and Northumberland Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the North East of England project area.GOV.UK Search API ↗
- 2024-12-13 · publicationBuilding Digital UK annual report and accounts 2023 to 2024The annual accounts provide a financial and narrative summary of the activities of Building Digital UK for the year 2023 to 2024.GOV.UK Search API ↗
- 2024-12-13 · publicationSupporting information: BDUK's annual report 2023 to 2024Information supporting BDUK's annual report and accounts 2023 to 2024GOV.UK Search API ↗
- 2024-11-27 · publicationFrom Digital Infrastructure to Digital InclusionA research report that maps the route from digital infrastructure to digital inclusion.GOV.UK Search API ↗
- 2024-11-27 · publicationBeyond the digital divideResearch report examining the impact of poor connectivity on rural farmers in the UK.GOV.UK Search API ↗
- 2024-11-27 · publicationProject Gigabit progress update – November 2024This update outlines how Project Gigabit has progressed since the last update published in April 2024. It demonstrates the progress we are making, and provides an update on the location, scope, and timescales of our contracts and procurements.GOV.UK Search API ↗
- 2024-10-17 · consultation_closedProject Gigabit National Rolling Open Market Review September 2024GOV.UK Content API ↗
- 2024-10-17 · government_responseProject Gigabit National Rolling Open Market Review May 2024A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3 year period across the UK.GOV.UK Search API ↗
- 2024-09-17 · consultation_openedProject Gigabit National Rolling Open Market Review September 2024GOV.UK Content API ↗
- 2024-09-12 · publicationShared Rural Network (SRN) progress update - September 2024The Shared Rural Network (SRN) is designed to improve mobile coverage and boost connectivity across the UK, jointly funded by the Government and the UK’s four mobile network operators.GOV.UK Search API ↗
- 2024-09-05 · government_responseProject Gigabit National Rolling Open Market Review January 2023A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3 year period across the UK.GOV.UK Search API ↗
- 2024-07-30 · government_responseProject Gigabit National Rolling Open Market Review January 2024A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level across the UK.GOV.UK Search API ↗
- 2024-07-01 · consultation_closedProject Gigabit National Rolling Open Market Review May 2024GOV.UK Content API ↗
- 2024-05-30 · consultation_openedProject Gigabit National Rolling Open Market Review May 2024GOV.UK Content API ↗
- 2024-04-25 · government_responseProject Gigabit National Rolling Open Market Review September 2023A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3-year period across the UK.GOV.UK Search API ↗
- 2024-04-09 · publicationProject Gigabit progress update - April 2024This update describes how Building Digital UK’s Project Gigabit has developed since the last update was published in December. It seeks to demonstrate the progress we are making, and update the location, sizes and timescales of the procurements in our pipeline. The progress update also includes progress towards the government’s target of 85% gigabit coverage by 2025.GOV.UK Search API ↗
- 2024-04-09 · publicationConnecting gigabit communities: Revisiting rural schoolsAn in-house research paper reinterviewing two schools connected as hubs in the Rural Gigabit Connectivity programme.GOV.UK Search API ↗
- 2024-04-09 · publicationBDUK Corporate Plan 2024 to 2025The Building Digital UK (BDUK) Corporate Plan for 2024 to 2025 sets out our key strategic objectives for the year ending 31 March 2025.GOV.UK Search API ↗
- 2024-03-18 · government_responseShared Rural Network consultationPublic consultation on additional 4G mobile coverage to be provided in Total-Not-Spot (TNS) target intervention areas.GOV.UK Search API ↗
- 2024-02-23 · consultation_closedProject Gigabit National Rolling Open Market Review January 2024GOV.UK Content API ↗
- 2024-01-23 · consultation_openedProject Gigabit National Rolling Open Market Review January 2024GOV.UK Content API ↗
- 2023-12-15 · publicationProject Gigabit progress update, December 2023An update on the Project Gigabit Delivery plan and procurement pipeline for the £5 billion gigabit broadband roll out.GOV.UK Search API ↗
- 2023-12-14 · publicationBDUK Rural Gigabit Connectivity Hubs EvaluationAn interim report reviewing the impacts of the Hub product, which connects rural public buildings to gigabit broadband, delivered through the Rural Gigabit Connectivity (RGC) Programme.GOV.UK Search API ↗
- 2023-12-14 · publicationBDUK school benefit survey resultsThis report displays the results of a survey that was part of the Rural Gigabit Connectivity (RGC) Hubs Evaluation.GOV.UK Search API ↗
- 2023-12-14 · publicationLocal Full Fibre Networks Programme wave one final evaluationThis is the final evaluation by Ipsos UK for the four pilot projects of the Local Full Fibre Networks (LFFN) Programme. Includes project delivery details, counterfactual analysis of connectivity and economic impacts, qualitative findings and evidence review assessment exploring public sector impacts.GOV.UK Search API ↗
- 2023-11-21 · publicationBuilding Digital UK annual report and accounts 2022 to 2023The annual accounts provide a financial and narrative summary of the activities of Building Digital UK for the year 2022 to 2023.GOV.UK Search API ↗
- 2023-10-16 · consultation_closedProject Gigabit National Rolling Open Market Review September 2023GOV.UK Content API ↗
- 2023-10-11 · government_responseProject Gigabit - Lincolnshire (including north-east Lincolnshire and north Lincolnshire) and East Riding (Lot 23) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Lincolnshire (including north-east Lincolnshire and north Lincolnshire) and East Riding area. This consultation closes at 5pm on Wednesday 5 October 2022.GOV.UK Search API ↗
- 2023-10-09 · government_responseUK Gigabit Programme: Lancashire Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Lancashire project area.GOV.UK Search API ↗
- 2023-10-06 · government_responseProject Gigabit National Rolling Open Market Review May 2023A National Rolling Open Market Review request for information for all suppliers to submit information about their existing and planned build at premises level over the next 3-year period across the UK.GOV.UK Search API ↗
- 2023-10-06 · government_responseUK Gigabit Programme: Surrey Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Surrey project area.GOV.UK Search API ↗
- 2023-09-20 · publicationBDUK Vouchers Evaluation: Impacts and Value for Money AssessmentThis is the second report of analytical findings on vouchers’ effect on broadband availability and performance and resulting economic impacts. Includes a survey of residential voucher recipients, and estimates wellbeing and environmental impacts.GOV.UK Search API ↗
- 2023-09-20 · publicationProject Gigabit progress update - September 2023An update on the Project Gigabit Delivery plan and procurement pipeline for the £5 billion gigabit broadband roll out.GOV.UK Search API ↗
- 2023-09-15 · consultation_openedProject Gigabit National Rolling Open Market Review September 2023GOV.UK Content API ↗
- 2023-09-08 · government_responseProject Gigabit - Essex (Lot 21) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Essex area. This consultation closes at 5pm on Friday 4 November 2022.GOV.UK Search API ↗
- 2023-09-08 · government_responseProject Gigabit - Newcastle and North Tyneside (Lot 38) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Newcastle and North Tyneside area. This consultation closes at 5pm on Friday 4 November 2022.GOV.UK Search API ↗
- 2023-09-08 · government_responseProject Gigabit - Merseyside and Greater Manchester (Lot 36) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Merseyside and Greater Manchester area. This consultation closes at 5pm on Friday 4 November 2022.GOV.UK Search API ↗
- 2023-09-08 · government_responseProject Gigabit - Greater London (Lot 37) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Greater London area. This consultation closes at 5pm on Friday 4 November 2022.GOV.UK Search API ↗
- 2023-09-08 · government_responseProject Gigabit - Birmingham and the Black Country (Lot 35) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Birmingham and the Black Country area. This consultation closes at 5pm on Friday 4 November 2022.GOV.UK Search API ↗
- 2023-09-03 · publicationSuperfast Broadband Programme - State Aid evaluation report 2023The 2023 State Aid evaluation of the Superfast Broadband Programme, commissioned by Building Digital UK and carried out by Ipsos UK.GOV.UK Search API ↗
- 2023-08-29 · government_responseProject Gigabit - Mid/East Devon and West Somerset (Lot 6) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Devon and Somerset area. This consultation closes at 5pm on Friday 4 November 2022.GOV.UK Search API ↗
- 2023-08-10 · government_responseProject Gigabit Programme: Derbyshire Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Derbyshire area.GOV.UK Search API ↗
- 2023-08-04 · government_responseProject Gigabit - North Yorkshire (Lot 31) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Northern North Yorkshire area. This consultation closes at 5pm on Friday 4 November 2022.GOV.UK Search API ↗
- 2023-08-02 · government_responseProject Gigabit - East Gloucestershire (Lot 18) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the East Gloucestershire area. This consultation closes at 5pm on Wednesday 5 October 2022.GOV.UK Search API ↗
- 2023-08-02 · government_responseProject Gigabit - West Herefordshire and Forest of Dean (Lot 15) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the West Herefordshire and Forest of Dean area. This consultation closes at 5pm on Wednesday 5 October 2022.GOV.UK Search API ↗
- 2023-07-19 · publicationBDUK Corporate Plan 2023 to 2026The Building Digital UK (BDUK) Corporate Plan for 2023 to 2026 sets out key objectives for the next three years, with more detailed targets for the next financial year, to ensure that homes and businesses across the UK can access fast and reliable digital connectivity.GOV.UK Search API ↗
- 2023-07-14 · government_responseProject Gigabit - Cornwall and Isles of Scilly (Lot 32) Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Cornwall and Isles of Scilly area. This consultation closes at 5pm on Friday 4 November 2022.GOV.UK Search API ↗
- 2023-07-14 · government_responseUK Gigabit Programme: Staffordshire Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Staffordshire project area.GOV.UK Search API ↗
- 2023-06-30 · publicationProject Gigabit progress update, June 2023An update on the Project Gigabit delivery plan and procurement pipeline.GOV.UK Search API ↗
- 2023-06-20 · consultation_closedProject Gigabit National Rolling Open Market Review May 2023GOV.UK Content API ↗
- 2023-06-06 · consultation_closedNorthern Ireland Project Gigabit Public Review - request for informationThe Department for the Economy is conducting a public review to inform a new procurement exercise to extend coverage of gigabit-capable broadband across Northern Ireland. The data table shows how the department has assessed broadband coverage by postcode.GOV.UK Search API ↗
- 2023-06-05 · consultation_openedNorthern Ireland Project Gigabit Public Review - request for informationGOV.UK Content API ↗
- 2023-05-31 · government_responseProject Gigabit - Dorset and South Somerset (Lot 14) Public ReviewGOV.UK Content API ↗
- 2023-05-19 · consultation_openedProject Gigabit National Rolling Open Market Review May 2023GOV.UK Content API ↗
- 2023-05-16 · government_responseProject Gigabit Programme: Shropshire Public ReviewGOV.UK Content API ↗
- 2023-04-26 · government_responseProject Gigabit Programme: South Yorkshire Public ReviewGOV.UK Content API ↗
- 2023-04-26 · government_responseProject Gigabit Programme: West Yorkshire and York area Public ReviewGOV.UK Content API ↗
- 2023-03-31 · government_responseInverness and Highland City-Region Deal: Digital Project Public ReviewGOV.UK Content API ↗
- 2023-03-24 · government_responseUK Gigabit Programme: Oxfordshire and West Berkshire Public ReviewGOV.UK Content API ↗
- 2023-03-24 · government_responseProject Gigabit National Rolling Open Market Review September 2022GOV.UK Content API ↗
- 2023-03-23 · consultation_closedBroadband infrastructure in Scotland: Public ReviewA Public Review to confirm eligible premises in Scotland for public investment via Project Gigabit, which has an ambition to deliver nationwide gigabit-capable broadband as soon as possible.GOV.UK Search API ↗
- 2023-03-23 · consultation_openedBroadband infrastructure in Scotland: Public ReviewGOV.UK Content API ↗
- 2023-03-03 · consultation_closedProject Gigabit National Rolling Open Market Review January 2023GOV.UK Content API ↗
- 2023-02-27 · publicationProject Gigabit Delivery plan - winter update 2023An update on the Project Gigabit Delivery plan and procurement pipeline for the £5 billion gigabit broadband roll out.GOV.UK Search API ↗
- 2023-02-07 · government_responseProject Gigabit: Wiltshire and South Gloucestershire (inc Swindon) Public ReviewGOV.UK Content API ↗
- 2023-01-20 · consultation_openedProject Gigabit National Rolling Open Market Review January 2023GOV.UK Content API ↗
- 2022-12-29 · government_responseProject Gigabit National Rolling Open Market Review May 2022GOV.UK Content API ↗
- 2022-12-13 · consultation_closedProject Gigabit: Open Market Review request for information - Northern IrelandAn open market review request for information from broadband network providers operating in intervention areas identified in Northern Ireland.GOV.UK Search API ↗
- 2022-12-09 · consultation_openedProject Gigabit: Open Market Review request for information - Northern IrelandGOV.UK Content API ↗
- 2022-11-30 · publicationProject Gigabit Delivery plan - autumn update 2022An update on the Project Gigabit Delivery plan and procurement pipeline for the £5 billion gigabit broadband roll out.GOV.UK Search API ↗
- 2022-11-16 · government_responseProject Gigabit: public review request for information - WalesGOV.UK Content API ↗
- 2022-11-14 · consultation_closedInverness and Highland City-Region Deal: Digital Project Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - Essex (Lot 21) Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - Cornwall and Isles of Scilly (Lot 32) Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - Newcastle and North Tyneside (Lot 38) Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - Merseyside and Greater Manchester (Lot 36) Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - Greater London (Lot 37) Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - North Yorkshire (Lot 31) Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - Birmingham and the Black Country (Lot 35) Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - Mid/East Devon and West Somerset (Lot 6) Public ReviewGOV.UK Content API ↗
- 2022-11-04 · consultation_closedProject Gigabit - Dorset and South Somerset (Lot 14) Public ReviewGOV.UK Content API ↗
- 2022-10-17 · consultation_closedProject Gigabit National Rolling Open Market Review September 2022GOV.UK Content API ↗
- 2022-10-07 · consultation_openedInverness and Highland City-Region Deal: Digital Project Public ReviewGOV.UK Content API ↗
- 2022-10-05 · consultation_closedProject Gigabit - Lincolnshire (including north-east Lincolnshire and north Lincolnshire) and East Riding (Lot 23) Public ReviewGOV.UK Content API ↗
- 2022-10-05 · consultation_closedProject Gigabit - East Gloucestershire (Lot 18) Public ReviewGOV.UK Content API ↗
- 2022-10-05 · consultation_closedProject Gigabit - West Herefordshire and Forest of Dean (Lot 15) Public ReviewGOV.UK Content API ↗
- 2022-10-05 · consultation_closedProject Gigabit - Cheshire (Lot 17) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - Essex (Lot 21) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - Cornwall and Isles of Scilly (Lot 32) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - Newcastle and North Tyneside (Lot 38) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - Merseyside and Greater Manchester (Lot 36) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - Greater London (Lot 37) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - North Yorkshire (Lot 31) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - Birmingham and the Black Country (Lot 35) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - Mid/East Devon and West Somerset (Lot 6) Public ReviewGOV.UK Content API ↗
- 2022-10-04 · consultation_openedProject Gigabit - Dorset and South Somerset (Lot 14) Public ReviewGOV.UK Content API ↗
- 2022-09-28 · government_responseUK Gigabit Programme: Worcestershire Public ReviewGOV.UK Content API ↗
- 2022-09-05 · consultation_openedProject Gigabit - Lincolnshire (including north-east Lincolnshire and north Lincolnshire) and East Riding (Lot 23) Public ReviewGOV.UK Content API ↗
- 2022-09-05 · consultation_openedProject Gigabit - East Gloucestershire (Lot 18) Public ReviewGOV.UK Content API ↗
- 2022-09-05 · consultation_openedProject Gigabit - West Herefordshire and Forest of Dean (Lot 15) Public ReviewGOV.UK Content API ↗
- 2022-09-05 · consultation_openedProject Gigabit - Cheshire (Lot 17) Public ReviewGOV.UK Content API ↗
- 2022-09-05 · consultation_openedProject Gigabit National Rolling Open Market Review September 2022GOV.UK Content API ↗
- 2022-07-29 · publicationBDUK’s 2021 to 2022 Performance ReportAn overview of BDUK’s delivery performance between April 2021 to March 2022, with a particular focus on gigabit broadband rollout.GOV.UK Search API ↗
- 2022-07-18 · consultation_closedProject Gigabit: Nottinghamshire and West of Lincolnshire Public ReviewGOV.UK Content API ↗
- 2022-07-18 · consultation_closedProject Gigabit Programme: South Yorkshire Public ReviewGOV.UK Content API ↗
- 2022-07-18 · consultation_closedProject Gigabit Programme: West Yorkshire and York area Public ReviewGOV.UK Content API ↗
- 2022-07-18 · consultation_closedProject Gigabit: Leicestershire and Warwickshire Public ReviewGOV.UK Content API ↗
- 2022-07-08 · government_responseUK Gigabit Programme: Cornwall and Isles of Scilly Public ReviewGOV.UK Content API ↗
- 2022-07-08 · government_responseUK Gigabit Programme: Dorset Public ReviewGOV.UK Content API ↗
- 2022-07-06 · consultation_closedUK Gigabit Programme: Essex Public ReviewThis review seeks information and supporting evidence about gigabit-capable broadband infrastructure within the Essex project area.GOV.UK Search API ↗
- 2022-07-06 · government_responseUK Gigabit Programme: Cumbria Public ReviewGOV.UK Content API ↗
- 2022-06-17 · consultation_openedProject Gigabit: Nottinghamshire and West of Lincolnshire Public ReviewGOV.UK Content API ↗
- 2022-06-17 · consultation_openedProject Gigabit Programme: South Yorkshire Public ReviewGOV.UK Content API ↗
- 2022-06-17 · consultation_openedProject Gigabit Programme: West Yorkshire and York area Public ReviewGOV.UK Content API ↗
- 2022-06-17 · consultation_openedProject Gigabit: Leicestershire and Warwickshire Public ReviewGOV.UK Content API ↗
- 2022-06-14 · consultation_closedProject Gigabit National Rolling Open Market Review May 2022GOV.UK Content API ↗
- 2022-05-24 · publicationLocal Full Fibre Network Programme: Wave 1 – interim evaluationThe interim evaluation of the Local Full Fibre Network Programme Wave 1, commissioned by DCMS and carried out by Ipsos MORI.GOV.UK Search API ↗
- 2022-05-24 · publicationSuperfast Broadband Programme - State Aid Evaluation Report 2020The State Aid evaluation of the UK National Broadband Scheme (the Superfast Broadband Programme), commissioned by DCMS and carried out by Ipsos MORI.GOV.UK Search API ↗
- 2022-05-24 · publicationEvaluation of the SuperConnected Cities ProgrammeEvaluation of the SuperConnected Cities Programme: Final Synthesis Report July 2019GOV.UK Search API ↗
- 2022-05-24 · publicationSuperfast Broadband Programme: Synthesis and process evaluation reports 2021The evaluation of the UK National Broadband Scheme (the Superfast Broadband Programme), commissioned by DCMS and carried out by Ipsos MORI.GOV.UK Search API ↗
- 2022-05-06 · consultation_closedProject Gigabit: public review request for information - WalesGOV.UK Content API ↗
- 2022-05-06 · consultation_closedProject Gigabit: Open Market Review request for information - First Release of Phase 3GOV.UK Content API ↗
- 2022-05-06 · government_responseProject Gigabit: Open Market Review request for information - First Release of Phase 3GOV.UK Content API ↗
- 2022-05-03 · consultation_openedProject Gigabit National Rolling Open Market Review May 2022GOV.UK Content API ↗
- 2022-04-29 · consultation_closedProject Gigabit : East Sussex Public ReviewGOV.UK Content API ↗
- 2022-04-29 · consultation_closedProject Gigabit: Bedfordshire, Northamptonshire and Milton Keynes Public ReviewGOV.UK Content API ↗
- 2022-04-29 · consultation_closedProject Gigabit: Wiltshire and South Gloucestershire (inc Swindon) Public ReviewGOV.UK Content API ↗
- 2022-04-29 · consultation_closedProject Gigabit Programme: Derbyshire Public ReviewGOV.UK Content API ↗
- 2022-04-29 · consultation_closedUK Gigabit Programme: Lancashire Public ReviewGOV.UK Content API ↗
- 2022-04-29 · consultation_closedUK Gigabit Programme: Surrey Public ReviewGOV.UK Content API ↗
- 2022-04-29 · publicationBDUK Corporate Plan 2022 to 2023The Building Digital UK (BDUK) Corporate Plan for 2022-23 sets out key objectives, measures and milestones for the next financial year to ensure that homes and businesses across the UK can access fast and reliable digital connectivity.GOV.UK Search API ↗
- 2022-04-08 · consultation_openedProject Gigabit: public review request for information - WalesGOV.UK Content API ↗
- 2022-04-06 · consultation_openedProject Gigabit: Open Market Review request for information - First Release of Phase 3GOV.UK Content API ↗
- 2022-03-29 · consultation_openedProject Gigabit : East Sussex Public ReviewGOV.UK Content API ↗
- 2022-03-29 · consultation_openedProject Gigabit: Bedfordshire, Northamptonshire and Milton Keynes Public ReviewGOV.UK Content API ↗
- 2022-03-29 · consultation_openedProject Gigabit: Wiltshire and South Gloucestershire (inc Swindon) Public ReviewGOV.UK Content API ↗
- 2022-03-29 · consultation_openedProject Gigabit Programme: Derbyshire Public ReviewGOV.UK Content API ↗
- 2022-03-29 · consultation_openedUK Gigabit Programme: Lancashire Public ReviewGOV.UK Content API ↗
- 2022-03-29 · consultation_openedUK Gigabit Programme: Surrey Public ReviewGOV.UK Content API ↗
- 2022-03-04 · consultation_closedProject Gigabit: West Sussex Public ReviewGOV.UK Content API ↗
- 2022-03-04 · consultation_closedUK Gigabit Programme: Oxfordshire and West Berkshire Public ReviewGOV.UK Content API ↗
- 2022-03-04 · consultation_closedUK Gigabit Programme: Staffordshire Public ReviewGOV.UK Content API ↗
- 2022-03-04 · consultation_closedUK Gigabit Programme: Worcestershire Public ReviewGOV.UK Content API ↗
- 2022-03-04 · consultation_closedUK Gigabit Programme: Kent Public ReviewGOV.UK Content API ↗
- 2022-03-04 · consultation_closedUK Gigabit Programme: Buckinghamshire, Hertfordshire and East of Berkshire Public ReviewGOV.UK Content API ↗
- 2022-02-15 · consultation_closedProject Gigabit National Rolling Open Market Review January 2022GOV.UK Content API ↗
- 2022-02-15 · government_responseProject Gigabit National Rolling Open Market Review January 2022GOV.UK Content API ↗
- 2022-02-04 · consultation_openedProject Gigabit: West Sussex Public ReviewGOV.UK Content API ↗
- 2022-02-04 · consultation_openedUK Gigabit Programme: Oxfordshire and West Berkshire Public ReviewGOV.UK Content API ↗
- 2022-02-04 · consultation_openedUK Gigabit Programme: Staffordshire Public ReviewGOV.UK Content API ↗
- 2022-02-04 · consultation_openedUK Gigabit Programme: Worcestershire Public ReviewGOV.UK Content API ↗
- 2022-02-04 · consultation_openedUK Gigabit Programme: Kent Public ReviewGOV.UK Content API ↗
- 2022-02-04 · consultation_openedUK Gigabit Programme: Buckinghamshire, Hertfordshire and East of Berkshire Public ReviewGOV.UK Content API ↗
- 2022-01-07 · consultation_openedProject Gigabit National Rolling Open Market Review January 2022GOV.UK Content API ↗
- 2021-09-20 · consultation_closedUK Gigabit Programme: Norfolk Public ReviewGOV.UK Content API ↗
- 2021-09-20 · consultation_closedProject Gigabit Programme: Shropshire Public ReviewGOV.UK Content API ↗
- 2021-09-20 · consultation_closedProject Gigabit Programme: Suffolk Public ReviewGOV.UK Content API ↗
- 2021-09-20 · consultation_closedUK Gigabit Programme: Hampshire and Isle of Wight Public ReviewGOV.UK Content API ↗
- 2021-08-19 · consultation_openedUK Gigabit Programme: Norfolk Public ReviewGOV.UK Content API ↗
- 2021-08-19 · consultation_openedProject Gigabit Programme: Shropshire Public ReviewGOV.UK Content API ↗
- 2021-08-19 · consultation_openedProject Gigabit Programme: Suffolk Public ReviewGOV.UK Content API ↗
- 2021-08-19 · consultation_openedUK Gigabit Programme: Hampshire and Isle of Wight Public ReviewGOV.UK Content API ↗
- 2021-08-16 · consultation_closedUK Gigabit Programme: Cornwall and Isles of Scilly Public ReviewGOV.UK Content API ↗
- 2021-08-01 · consultation_closedUK Gigabit Programme: Dorset Public ReviewGOV.UK Content API ↗
- 2021-07-27 · consultation_closedShared Rural Network consultationGOV.UK Content API ↗
- 2021-07-18 · consultation_closedProject Gigabit: Durham, Tyneside and Teesside and Northumberland Public ReviewGOV.UK Content API ↗
- 2021-07-15 · consultation_openedUK Gigabit Programme: Cornwall and Isles of Scilly Public ReviewGOV.UK Content API ↗
- 2021-06-29 · consultation_openedShared Rural Network consultationGOV.UK Content API ↗
- 2021-06-24 · consultation_openedUK Gigabit Programme: Dorset Public ReviewGOV.UK Content API ↗
- 2021-06-18 · consultation_openedProject Gigabit: Durham, Tyneside and Teesside and Northumberland Public ReviewGOV.UK Content API ↗
- 2021-06-08 · consultation_closedUK Gigabit Programme: Cambridgeshire Public ReviewGOV.UK Content API ↗
- 2021-05-07 · consultation_openedUK Gigabit Programme: Cambridgeshire Public ReviewGOV.UK Content API ↗
- 2021-03-18 · consultation_openedUK Gigabit Programme: Essex Public ReviewGOV.UK Content API ↗
- 2021-03-09 · consultation_closedUK Gigabit Programme: Cumbria Public ReviewGOV.UK Content API ↗
- 2021-02-09 · consultation_openedUK Gigabit Programme: Cumbria Public ReviewGOV.UK Content API ↗