Executive non-departmental public body
Nuclear Decommissioning Authority
Current ministers, official publications and departmental history, exactly as published.
§ Ministers
Recorded ministerial post holdings
0 recorded
No ministerial post holdings are recorded against this organisation's official GOV.UK URL yet.
§ Consultations
Consultations and government responses
31 recorded
Government response · 2026-04-21
Nuclear Decommissioning Authority: Draft Business Plan 2026 to 2029 for consultation
Government response · 2026-01-06
The NDA group Draft Strategy 2025 for public consultation
Government response · 2025-06-18
Nuclear Decommissioning Authority: Draft Business Plan 2025 to 2028 for consultation
Government response · 2024-04-23
Nuclear Decommissioning Authority: Draft Business Plan 2024 to 2027 for consultation
Government response · 2024-04-05
NDA Social Impact and Communities Strategy Consultation Nov 2023
Government response · 2023-04-21
Nuclear Decommissioning Authority: Draft Business Plan 2023 to 2026 for consultation
Government response · 2022-03-22
Nuclear Decommissioning Authority: Draft Business Plan 2022 to 2025 for consultation
Government response · 2021-03-22
NDA Draft Business Plan 2021 to 2024 for Consultation
Government response · 2021-03-18
Nuclear Decommissioning Authority (NDA) Draft Strategy for Consultation
Government response · 2020-11-19
NDA Radioactive Waste Strategy
Government response · 2020-07-01
NDA local social and economic impact strategy 2020 update
Government response · 2020-04-27
Nuclear Decommissioning Authority: Business Plan 2020 to 2023
Government response · 2019-03-29
Nuclear Decommissioning Authority: Business Plan 2019 to 2022
Closed consultation · 2018-11-14
STEM Engagement across the NDA Group
Government response · 2018-03-29
Nuclear Decommissioning Authority: Business Plan 2018 to 2021
Government response · 2017-03-30
Nuclear Decommissioning Authority: Business Plan 2017 to 2020
Government response · 2026-04-21
Nuclear Decommissioning Authority: Draft Business Plan 2026 to 2029 for consultation
Government response · 2026-01-06
The NDA group Draft Strategy 2025 for public consultation
Government response · 2025-06-18
Nuclear Decommissioning Authority: Draft Business Plan 2025 to 2028 for consultation
Government response · 2024-04-23
Nuclear Decommissioning Authority: Draft Business Plan 2024 to 2027 for consultation
Government response · 2024-04-05
NDA Social Impact and Communities Strategy Consultation Nov 2023
Government response · 2023-04-21
Nuclear Decommissioning Authority: Draft Business Plan 2023 to 2026 for consultation
Government response · 2022-03-22
Nuclear Decommissioning Authority: Draft Business Plan 2022 to 2025 for consultation
Government response · 2021-03-22
NDA Draft Business Plan 2021 to 2024 for Consultation
Government response · 2021-03-18
Nuclear Decommissioning Authority (NDA) Draft Strategy for Consultation
Government response · 2020-11-19
NDA Radioactive Waste Strategy
Government response · 2020-07-01
NDA local social and economic impact strategy 2020 update
Government response · 2020-04-27
Nuclear Decommissioning Authority: Business Plan 2020 to 2023
Government response · 2019-03-29
Nuclear Decommissioning Authority: Business Plan 2019 to 2022
Government response · 2018-03-29
Nuclear Decommissioning Authority: Business Plan 2018 to 2021
Government response · 2017-03-30
Nuclear Decommissioning Authority: Business Plan 2017 to 2020
§ Publications
Other official publications
102 recorded
Corporate report · 2026-07-16
Nuclear Decommissioning Authority: Annual Report and Accounts 2025 to 2026
Transparency release · 2026-07-08
NDA: Register of Board Members’ Interests
Corporate report · 2026-06-25
Directions for Hinkley Point B
Impact assessment · 2026-05-27
Economic Impact Assessment of NDA Sites
Guidance · 2026-05-21
How we manage waste more sustainably
notice · 2026-04-24
Countering Illegal Use of UAS Around Prisons and Sensitive Sites
Government response · 2026-04-21
Nuclear Decommissioning Authority: Draft Business Plan 2026 to 2029 for consultation
Transparency release · 2026-04-08
Nuclear Decommissioning Authority: Information Asset Register
Corporate report · 2026-03-26
Memorandum of Understanding between NDA and Environment Agency
Research · 2026-03-26
Nuclear Decommissioning Authority Areas of Research Interest
Guidance · 2026-03-26
Memorandum of Understanding between NDA and ONR
Guidance · 2026-03-26
EGG10 Research and Development Requirements (TBuRD)
Research · 2026-03-26
The NDA’s Grand Challenges for Technical Innovation
Corporate report · 2026-03-26
The NDA group Technical Baseline Review
Transparency release · 2026-03-25
Nuclear Restoration Services: gender pay gap report 2024 to 2025
Transparency release · 2026-03-25
The NDA group gender pay gap report 2024 to 2025
Corporate report · 2026-03-24
NRS Dounreay socio economic annual review 2024/25
Corporate report · 2026-03-16
Nuclear Decommissioning Authority group Business Plan 2026 to 2029
Transparency release · 2026-03-11
NDA hospitality and gifts register
Corporate report · 2026-02-24
Directions for Hunterston B
Corporate report · 2026-02-23
The NDA group Strategy Effective from March 2026
Government response · 2026-01-06
The NDA group Draft Strategy 2025 for public consultation
Corporate report · 2025-11-28
The Nuclear Decommissioning Authority mission progress report 2025
Corporate report · 2025-11-28
NDA socio-economic report 2024 to 2025
Corporate report · 2025-10-02
NDA modern slavery and human trafficking statement
Corporate report · 2025-07-22
Nuclear Decommissioning Authority: Annual Report and Accounts 2024 to 2025
Transparency release · 2025-07-14
Nuclear Decommissioning Authority: Organisation Chart
Transparency release · 2025-06-20
Nuclear Decommissioning Authority: job levels and salary ranges
Government response · 2025-06-18
Nuclear Decommissioning Authority: Draft Business Plan 2025 to 2028 for consultation
Corporate report · 2025-06-05
Nuclear Decommissioning Authority: Business Plan 2025 to 2028
Transparency release · 2025-03-28
NDA group gender pay gap report: 2023 to 2024
Corporate report · 2025-03-24
Nuclear Decommissioning Authority: Nature recovery plan
Corporate report · 2025-03-20
NRS Dounreay Socio Economic Impact Strategy 2025/26 to 2027/28
Corporate report · 2025-03-03
NRS Dounreay Socio Economic Annual Review 2023 to 2024
Corporate report · 2025-02-20
NDA Mid-year performance report 2024 to 2025
Corporate report · 2025-02-19
NDA research, development and innovation publications
Corporate report · 2024-12-20
Nuclear Decommisioning Authority: supply chain charter
Corporate report · 2024-11-18
The Nuclear Decommissioning Authority Mission Progress Report 2024
Corporate report · 2024-10-09
Nuclear Decommissioning Authority: Annual Report and Accounts 2023 to 2024
Corporate report · 2024-09-25
NDA socio-economic report 2023 to 2024
Corporate report · 2024-09-13
NDA group heritage vision and strategy
Corporate report · 2024-09-10
Nuclear Decommissioning Authority Framework Document
Corporate report · 2024-09-02
NDA group sustainability report 2024
Corporate report · 2024-07-22
NDA and UKHSA Epidemiology Governance Group Annual Report 2023 to 2024
Government response · 2024-04-23
Nuclear Decommissioning Authority: Draft Business Plan 2024 to 2027 for consultation
Corporate report · 2024-04-23
NDA Social Impact and Communities Strategy April 2024
Corporate report · 2024-04-17
Nuclear Decommissioning Authority: Business Plan 2024 to 2027
Government response · 2024-04-05
NDA Social Impact and Communities Strategy Consultation Nov 2023
Corporate report · 2024-02-13
NDA internal review of information request handling complaints
Corporate report · 2024-02-13
NDA Speak Up Policy
Corporate report · 2024-02-07
NDA Mid-year performance report 2023 to 2024
Corporate report · 2024-01-04
NDA Direct Research Portfolio (DRP) annual reports
Corporate report · 2023-12-21
The Dounreay socio economic annual review 2022 to 2023
correspondence · 2023-12-15
Letter to Secretary of State from NDA CEO
Corporate report · 2023-12-07
NDA socio-economic report 2022 to 2023
Corporate report · 2023-11-16
NDA strategic position on radioactive waste treatment
Corporate report · 2023-11-06
The Nuclear Decommissioning Authority Mission Progress Report 2023
Corporate report · 2023-10-12
NDA socio-economic report 2021 to 2022
Corporate report · 2023-10-02
Nuclear Decommissioning Authority: Annual Report and Accounts 2022 to 2023
Corporate report · 2023-09-13
NDA and UKHSA Epidemiology Governance Group Annual Report 2022 to 2023
§ Timeline
Departmental lifecycle events
139 recorded
- 2026-07-16 · publicationNuclear Decommissioning Authority: Annual Report and Accounts 2025 to 2026Our Annual Report and Accounts 2025 to 2026 highlights the progress the NDA group has made in reducing hazards and decommissioning the UK’s civil nuclear sites.GOV.UK Search API ↗
- 2026-07-08 · publicationNDA: Register of Board Members’ InterestsThis document lists the registered interests of the Nuclear Decommissioning Authority’s Board Members.GOV.UK Search API ↗
- 2026-06-25 · publicationDirections for Hinkley Point BDesignation to the Nuclear Decommissioning Authority (NDA) to allow them to decommission the Hinkley Point B nuclear site.GOV.UK Search API ↗
- 2026-05-27 · publicationEconomic Impact Assessment of NDA SitesThis report shows the economic impact of NDA sites across the UK, supporting jobs, communities and economic activity at local, regional and national levels.GOV.UK Search API ↗
- 2026-05-21 · publicationHow we manage waste more sustainablyThis guidance explains how waste from the final stages of nuclear decommissioning is managed to achieve safe, sustainable outcomes for people, the environment and local communities.GOV.UK Search API ↗
- 2026-04-24 · publicationCountering Illegal Use of UAS Around Prisons and Sensitive SitesSeeking low-collateral solutions to counter hostile Uncrewed Aerial Systems (UAS), used for contraband delivery, surveillance near prisons and sensitive sitesGOV.UK Search API ↗
- 2026-04-21 · government_responseNuclear Decommissioning Authority: Draft Business Plan 2026 to 2029 for consultationThe Nuclear Decommissioning Authority (NDA) has published its 2026-2029 Draft Business Plan for an 8-week consultation, running from 8 December 2025 to 2 February 2026.GOV.UK Search API ↗
- 2026-04-08 · publicationNuclear Decommissioning Authority: Information Asset RegisterNDA's Information Asset Register (IAR) is a table of information relating to the important datasets that the NDA is responsible for.GOV.UK Search API ↗
- 2026-03-26 · publicationMemorandum of Understanding between NDA and ONRThis Memorandum of Understanding (MoU) is between the Office for Nuclear Regulation (ONR) and the Nuclear Decommissioning Authority (NDA).GOV.UK Search API ↗
- 2026-03-26 · publicationThe NDA group Technical Baseline ReviewThis report provides a high-level overview of the processes and associated technologies used or planned to be used to deliver our mission.GOV.UK Search API ↗
- 2026-03-26 · publicationMemorandum of Understanding between NDA and Environment AgencyThis Memorandum of Understanding (MoU) is between the Environment Agency (EA) and the Nuclear Decommissioning Authority (NDA).GOV.UK Search API ↗
- 2026-03-26 · publicationEGG10 Research and Development Requirements (TBuRD)The Technical Baseline and underpinning Research and Development (TBuRD) process is how we track Research and Development (R&D) across the NDA group.GOV.UK Search API ↗
- 2026-03-26 · publicationNuclear Decommissioning Authority Areas of Research InterestThese reports provides details about the main research questions facing the NDA.GOV.UK Search API ↗
- 2026-03-26 · publicationThe NDA’s Grand Challenges for Technical InnovationThe NDA’s Grand Challenges for Technical Innovation, provide a set of long-term aspirations out to 2030. This report is an interim update of the grand challenges.GOV.UK Search API ↗
- 2026-03-25 · publicationNuclear Restoration Services: gender pay gap report 2024 to 2025Data on the difference in employees’ average earnings from April 2024 to March 2025GOV.UK Search API ↗
- 2026-03-25 · publicationThe NDA group gender pay gap report 2024 to 2025Data on the difference in employees’ average earnings from April 2024 to March 2025 for the NDA group.GOV.UK Search API ↗
- 2026-03-24 · publicationNRS Dounreay socio economic annual review 2024/25An report outlining the socio economic activities carried out by NRS Dounreay during the financial year 2024/25,GOV.UK Search API ↗
- 2026-03-16 · publicationNuclear Decommissioning Authority group Business Plan 2026 to 2029The NDA Business Plan sets out key activities and expected progress for all of the NDA’s nuclear sites over the next 3 years.GOV.UK Search API ↗
- 2026-03-11 · publicationNDA hospitality and gifts registerRegister of hospitality and gifts offered/accepted by NDA employees.GOV.UK Search API ↗
- 2026-02-24 · publicationDirections for Hunterston BDesignation to the Nuclear Decommissioning Authority (NDA) to allow them to decommission the Hunterston B nuclear site.GOV.UK Search API ↗
- 2026-02-23 · publicationThe NDA group Strategy Effective from March 2026This Strategy sets the long-term direction for how the NDA carries out its functions under the Energy Act (2004). It also provides the context for government oversight by the Department for Energy Security and Net Zero (DESNZ) and for public accountability.GOV.UK Search API ↗
- 2026-02-02 · consultation_closedNuclear Decommissioning Authority: Draft Business Plan 2026 to 2029 for consultationGOV.UK Content API ↗
- 2026-01-06 · government_responseThe NDA group Draft Strategy 2025 for public consultationThe Nuclear Decommissioning Authority is consulting on its draft strategy for the safe, secure and sustainable decommissioning of the UK’s legacy nuclear sitesGOV.UK Search API ↗
- 2025-12-08 · consultation_openedNuclear Decommissioning Authority: Draft Business Plan 2026 to 2029 for consultationGOV.UK Content API ↗
- 2025-11-28 · publicationNDA socio-economic report 2024 to 2025This report provides a brief overview of the NDA group socio-economic funding commitments for the financial year 2024 to 2025.GOV.UK Search API ↗
- 2025-11-28 · publicationThe Nuclear Decommissioning Authority mission progress report 2025This report shows the progress being made against the NDA mission to decommission the UK’s earliest nuclear sites safely, securely and cost effectively.GOV.UK Search API ↗
- 2025-10-02 · publicationNDA modern slavery and human trafficking statementWe are committed to ensuring that there is no modern slavery or human trafficking in our supply chains or in any part of our business.GOV.UK Search API ↗
- 2025-09-29 · consultation_closedThe NDA group Draft Strategy 2025 for public consultationGOV.UK Content API ↗
- 2025-07-22 · publicationNuclear Decommissioning Authority: Annual Report and Accounts 2024 to 2025Our Annual Report and Accounts 2024 to 2025 sets out the progress made towards our mission of reducing hazards and decommissioning the UK’s civil nuclear sites.GOV.UK Search API ↗
- 2025-07-14 · publicationNuclear Decommissioning Authority: Organisation ChartNuclear Decommissioning Authority organisation chart showing senior positions and names, with structure for other functions.GOV.UK Search API ↗
- 2025-07-07 · consultation_openedThe NDA group Draft Strategy 2025 for public consultationGOV.UK Content API ↗
- 2025-06-20 · publicationNuclear Decommissioning Authority: job levels and salary rangesJob levels and salary ranges for employees at the Nuclear Decommissioning Authority.GOV.UK Search API ↗
- 2025-06-18 · government_responseNuclear Decommissioning Authority: Draft Business Plan 2025 to 2028 for consultationThe NDA Draft Business Plan sets out key activities and expected progress for all 17 of the NDA’s nuclear sites over the next 3 years. We want to hear from anyone who has a comment on any aspect of this document.GOV.UK Search API ↗
- 2025-06-05 · publicationNuclear Decommissioning Authority: Business Plan 2025 to 2028The NDA Business Plan sets out key activities and expected progress for all 17 of the NDA’s nuclear sites over the next 3 years.GOV.UK Search API ↗
- 2025-04-22 · consultation_closedNuclear Decommissioning Authority: Draft Business Plan 2025 to 2028 for consultationGOV.UK Content API ↗
- 2025-03-28 · publicationNDA group gender pay gap report: 2023 to 2024Data on the difference in employees’ average earnings from April 2023 to March 2024 for the NDA group.GOV.UK Search API ↗
- 2025-03-24 · publicationNuclear Decommissioning Authority: Nature recovery planThrough the implementation of this Nature Recovery Plan (NRP) we'll help address the decline of biodiversity by strategically conserving and restoring natural habitats and species within our control as well as supporting government aims and objectives for nature recovery.GOV.UK Search API ↗
- 2025-03-20 · publicationNRS Dounreay Socio Economic Impact Strategy 2025/26 to 2027/28This document outlines NRS Dounreay's socio economic impact strategy for Caithness and north Sutherland from 2025/26 to 2027/28GOV.UK Search API ↗
- 2025-03-10 · consultation_openedNuclear Decommissioning Authority: Draft Business Plan 2025 to 2028 for consultationGOV.UK Content API ↗
- 2025-03-03 · publicationNRS Dounreay Socio Economic Annual Review 2023 to 2024The NRS Dounreay review of socio-economic activity from 2023 to 2024.GOV.UK Search API ↗
- 2025-02-20 · publicationNDA Mid-year performance report 2024 to 2025This report provides the status of the group key targets and Business Plan activities as at the mid-year of the 2024 to 2025 financial year.GOV.UK Search API ↗
- 2025-02-19 · publicationNDA research, development and innovation publicationsFind out more about the impact of our investment in research, development and innovation across the NDA group.GOV.UK Search API ↗
- 2024-12-20 · publicationNuclear Decommisioning Authority: supply chain charterThe Supply Chain Charter for nuclear decommissioning sites aims to foster good working relations across the NDA group's supply chain.GOV.UK Search API ↗
- 2024-11-18 · publicationThe Nuclear Decommissioning Authority Mission Progress Report 2024This report shows the progress being made against the NDA mission to decommission the UK’s earliest nuclear sites safely, securely and cost effectively.GOV.UK Search API ↗
- 2024-10-09 · publicationNuclear Decommissioning Authority: Annual Report and Accounts 2023 to 2024Our Annual Report and Accounts 2023 to 2024 sets out the progress made towards our mission of reducing hazards and decommissioning the UK’s civil nuclear sites.GOV.UK Search API ↗
- 2024-09-25 · publicationNDA socio-economic report 2023 to 2024This report provides a brief overview of the NDA group socio-economic funding commitments for the financial year 2023 to 2024.GOV.UK Search API ↗
- 2024-09-13 · publicationNDA group heritage vision and strategyThe NDA group heritage strategy has been developed to identify, safeguard and celebrate the cultural heritage of the nuclear industry.GOV.UK Search API ↗
- 2024-09-10 · publicationNuclear Decommissioning Authority Framework DocumentThe broad governance and management framework within which the Nuclear Decommissioning Authority (NDA) will operate.GOV.UK Search API ↗
- 2024-09-02 · publicationNDA group sustainability report 2024This report sets out the progress being made by the NDA group towards its sustainability goals, covering areas such as risk and hazard reduction, skills, communities and supply chain.GOV.UK Search API ↗
- 2024-07-22 · publicationNDA and UKHSA Epidemiology Governance Group Annual Report 2023 to 2024This document provides a summary of activity during the financial year 2023 to 2024 in relation to work governed by this group.GOV.UK Search API ↗
- 2024-04-23 · government_responseNuclear Decommissioning Authority: Draft Business Plan 2024 to 2027 for consultationThe NDA Draft Business Plan sets out key activities and expected progress for all 17 of the NDA’s nuclear sites over the next 3 years. We want to hear from anyone who has a comment on any aspect of this document.GOV.UK Search API ↗
- 2024-04-23 · publicationNDA Social Impact and Communities Strategy April 2024This strategy outlines our current approach to socio-economics and includes a consolidated view of various improvements and amendments that have been made over the last few years.GOV.UK Search API ↗
- 2024-04-17 · publicationNuclear Decommissioning Authority: Business Plan 2024 to 2027The NDA Business Plan sets out key activities and expected progress for all 17 of the NDA’s nuclear sites over the next 3 years.GOV.UK Search API ↗
- 2024-04-05 · government_responseNDA Social Impact and Communities Strategy Consultation Nov 2023This strategy outlines our current approach to socio-economics and includes a consolidated view of various improvements and amendments that have been made over the last few years.GOV.UK Search API ↗
- 2024-02-21 · consultation_closedNDA Social Impact and Communities Strategy Consultation Nov 2023GOV.UK Content API ↗
- 2024-02-13 · publicationNDA Speak Up PolicyThis policy aims to ensure all concerns raised are captured, considered, and dealt with appropriately. It will also help us to learn from the matters that are raised so that we can improve how NDA operates as part of our vision to create great places to work.GOV.UK Search API ↗
- 2024-02-13 · publicationNDA internal review of information request handling complaintsThis procedure outlines how internal reviews should be conducted if a complaint is made regarding NDA handling of requests for information.GOV.UK Search API ↗
- 2024-02-07 · publicationNDA Mid-year performance report 2023 to 2024This report provides the status of the group key targets and Business Plan activities as at the mid-year of the 2023 to 2024 financial year.GOV.UK Search API ↗
- 2024-01-29 · consultation_closedNuclear Decommissioning Authority: Draft Business Plan 2024 to 2027 for consultationGOV.UK Content API ↗
- 2024-01-04 · publicationNDA Direct Research Portfolio (DRP) annual reportsThese reports outline several projects and key themes funded through the Direct Research Portfolio each year.GOV.UK Search API ↗
- 2023-12-21 · publicationThe Dounreay socio economic annual review 2022 to 2023This report gives a brief overview of Dounreay socio-economic funding commitments for the financial year 2022 to 2023.GOV.UK Search API ↗
- 2023-12-15 · publicationLetter to Secretary of State from NDA CEONDA CEO responds to a letter from Secretary of State Department for Energy Security & Net Zero, regarding the allegations made by the Guardian in relation to operations at Sellafield Ltd.GOV.UK Search API ↗
- 2023-12-07 · publicationNDA socio-economic report 2022 to 2023This report provides a brief overview of the NDA group socio-economic funding commitments for the financial year 2022 to 2023.GOV.UK Search API ↗
- 2023-12-04 · consultation_openedNuclear Decommissioning Authority: Draft Business Plan 2024 to 2027 for consultationGOV.UK Content API ↗
- 2023-11-29 · consultation_openedNDA Social Impact and Communities Strategy Consultation Nov 2023GOV.UK Content API ↗
- 2023-11-16 · publicationNDA strategic position on radioactive waste treatmentThis document presents the Nuclear Decommissioning Authority’s (NDA’s) strategic position with respect to the treatment of radioactive waste.GOV.UK Search API ↗
- 2023-11-06 · publicationThe Nuclear Decommissioning Authority Mission Progress Report 2023This report shows the progress being made against the NDA mission to decommission the UK’s earliest nuclear sites safely, securely and cost effectively.GOV.UK Search API ↗
- 2023-10-12 · publicationNDA socio-economic report 2021 to 2022This report provides a brief overview of the NDA group socio-economic funding commitments for the financial year 2021 to 2022.GOV.UK Search API ↗
- 2023-10-02 · publicationNuclear Decommissioning Authority: Annual Report and Accounts 2022 to 2023Our Annual Report and Accounts 2022-23 sets out the progress made towards our mission of reducing hazards and decommissioning the UK’s civil nuclear sites.GOV.UK Search API ↗
- 2023-09-13 · publicationNDA and UKHSA Epidemiology Governance Group Annual Report 2022 to 2023This document provides a summary of activity during the financial year 2022 to 2023 in relation to work governed by this group.GOV.UK Search API ↗
- 2023-09-12 · publicationNDA socio-economic report 2020 to 2021This report provides a brief overview of the NDA group socio-economic funding commitments for the financial year 2020 to 2021.GOV.UK Search API ↗
- 2023-07-14 · publicationAssessment of the benefits of the NDA innovation portfolioThis report, carried out by know.consulting, was commissioned by the NDA to deliver a baseline benefits assessment of the past and current NDA innovation portfolio. Figures and terminology were accurate at the time the report was completed.GOV.UK Search API ↗
- 2023-04-21 · government_responseNuclear Decommissioning Authority: Draft Business Plan 2023 to 2026 for consultationGOV.UK Content API ↗
- 2023-04-21 · publicationNDA Small to Medium sized Enterprise (SME) Action PlanThis SME Action Plan focuses on the engagement between the NDA and SMEs.GOV.UK Search API ↗
- 2023-04-20 · publicationNuclear Decommissioning Authority: Business Plan 2023 to 2026The NDA Business Plan sets out key activities and expected progress for all 17 of the NDA’s nuclear sites over the next 3 years.GOV.UK Search API ↗
- 2023-03-31 · publicationNDA Mid-year performance report 2022 to 2023This report provides the status of the group key targets and Business Plan activities as at the mid-year of the 2022 to 2023 financial year.GOV.UK Search API ↗
- 2023-03-15 · publicationDirect Research Portfolio annual report 2020 to 2021This report outlines several projects and key themes funded through the DRP from 2020 to 2021, for which the total investment was £4.2 million.GOV.UK Search API ↗
- 2023-02-08 · publicationUK Radioactive Waste and Material Inventory 2022The 2022 Inventory provides information on radioactive waste stocks (at 1 April 2022) and forecasts of future waste arisings. Information on radioactive materials that may be classed as waste in the future is also presented.GOV.UK Search API ↗
- 2023-02-06 · consultation_closedNuclear Decommissioning Authority: Draft Business Plan 2023 to 2026 for consultationGOV.UK Content API ↗
- 2022-12-12 · consultation_openedNuclear Decommissioning Authority: Draft Business Plan 2023 to 2026 for consultationGOV.UK Content API ↗
- 2022-12-01 · publicationThe Nuclear Decommissioning Authority Mission Progress Report 2022This report shows the progress being made against the NDA mission to clean-up the UK’s earliest nuclear sites safely, securely and cost effectively.GOV.UK Search API ↗
- 2022-11-03 · publicationNDA group Health, Safety & Wellbeing Policy StatementThis policy includes the principles that the Nuclear Decommissioning Authority will follow to provide a safe and healthy environment across the NDA group where our employees are able to thrive at work.GOV.UK Search API ↗
- 2022-10-04 · publicationNDA and UKHSA Epidemiology Governance Group Annual Report 2021 to 2022This document provides a summary of activity during the financial year 2021 to 2022 in relation to work governed by this group.GOV.UK Search API ↗
- 2022-09-28 · publicationThe NDA group Digital vision and strategy 2022 to 2025This strategy will provide clarity on how we define digital and the benefits we are trying to achieve across the NDA group.GOV.UK Search API ↗
- 2022-09-28 · publicationDounreay socio-economic reportA report on the social and economic importance of the Dounreay site within its local area of Caithness and North Sutherland.GOV.UK Search API ↗
- 2022-09-28 · publicationEconomic impact assessment of Magnox sites, May 2022An updated assessment of the economic impact of the 12 Magnox sites on their local economies.GOV.UK Search API ↗
- 2022-09-28 · publicationThe economic contribution of the NDA to the West Cumbria economy, April 2022An assessment of the economic contribution that Sellafield Ltd and Low Level Waste Repository (LLWR) Ltd made to the West Cumbria and UK economies in 2021.GOV.UK Search API ↗
- 2022-09-05 · publicationSocio-economic Story 2012-22Magnox is committed to providing and enabling socio-economic support in the communities in which it operates.GOV.UK Search API ↗
- 2022-09-05 · publication10 year summary of socio-economic funding 2012-2022Magnox is committed to providing and enabling socio-economic support in the communities in which it operates.GOV.UK Search API ↗
- 2022-07-14 · publicationNuclear Decommissioning Authority: Annual Report and Accounts 2021 to 2022Our Annual Report and Accounts 2021-22 sets out the progress made towards our mission of cleaning up and decommissioning the UK’s civil nuclear sites.GOV.UK Search API ↗
- 2022-06-13 · publicationNDA Innovation strategyThis document sets out the Nuclear Decommissioning Authority's innovation strategy across the NDA group.GOV.UK Search API ↗
- 2022-06-01 · publicationNDA socio-economic report 2019 to 2020This report provides a brief overview of socio-economic expenditure by NDA businesses during the financial year 2019 to 2020.GOV.UK Search API ↗
- 2022-03-30 · publicationThe NDA group Sustainability Strategy 2022This strategy sets out the NDA group's five-year path to becoming a leader in sustainability.GOV.UK Search API ↗
- 2022-03-22 · government_responseNuclear Decommissioning Authority: Draft Business Plan 2022 to 2025 for consultationGOV.UK Content API ↗
- 2022-03-22 · publicationNuclear Decommissioning Authority: Business Plan 2022 to 2025Our latest Business Plan includes a 20 year overview and our planned activities for the next 3 years.GOV.UK Search API ↗
- 2022-02-21 · publicationTelexistence Phase 2DASA seeks innovations to develop a complete telexistence system, integrating telepresence, robotic and haptic technologies on to a single platform.GOV.UK Search API ↗
- 2022-01-31 · consultation_closedNuclear Decommissioning Authority: Draft Business Plan 2022 to 2025 for consultationGOV.UK Content API ↗
- 2021-12-06 · consultation_openedNuclear Decommissioning Authority: Draft Business Plan 2022 to 2025 for consultationGOV.UK Content API ↗
- 2021-11-04 · publicationThe Nuclear Decommissioning Authority Mission Progress Report 2021This report demonstrates how much progress has been made in our mission since 2005, and how much further is left to go over the next 120-plus years.GOV.UK Search API ↗
- 2021-09-30 · publicationNDA value framework: how we make decisionsThe value framework comprises factors or “decision-criteria” against which we can assess the performance of options that enable our mission.GOV.UK Search API ↗
- 2021-09-28 · publicationNDA and PHE Epidemiology Governance Group Annual Report 2020 to 2021This document provides a summary of activity during the financial year 2020 to 2021 in relation to work governed by this group.GOV.UK Search API ↗
- 2021-09-27 · publicationThe NDA group inclusion strategy 2021 to 2025This strategy sets out the NDA’s diversity and inclusion priorities from 2021 to 2025.GOV.UK Search API ↗
- 2021-09-21 · publicationDirect Research Portfolio Annual Report 2019 to 2020The NDA group’s R&D investment of approximately £86 million in 2019 to 2020 included a separate budget for the direct commissioning of strategic projects. This Direct Research Portfolio is the focus of this report.GOV.UK Search API ↗
- 2021-03-22 · government_responseNDA Draft Business Plan 2021 to 2024 for ConsultationGOV.UK Content API ↗
- 2021-03-18 · government_responseNuclear Decommissioning Authority (NDA) Draft Strategy for ConsultationGOV.UK Content API ↗
- 2021-02-01 · consultation_closedNDA Draft Business Plan 2021 to 2024 for ConsultationGOV.UK Content API ↗
- 2020-12-07 · consultation_openedNDA Draft Business Plan 2021 to 2024 for ConsultationGOV.UK Content API ↗
- 2020-11-19 · government_responseNDA Radioactive Waste StrategyGOV.UK Content API ↗
- 2020-11-08 · consultation_closedNuclear Decommissioning Authority (NDA) Draft Strategy for ConsultationGOV.UK Content API ↗
- 2020-08-17 · consultation_openedNuclear Decommissioning Authority (NDA) Draft Strategy for ConsultationGOV.UK Content API ↗
- 2020-07-01 · government_responseNDA local social and economic impact strategy 2020 updateGOV.UK Content API ↗
- 2020-04-27 · government_responseNuclear Decommissioning Authority: Business Plan 2020 to 2023GOV.UK Content API ↗
- 2020-03-13 · consultation_closedNDA local social and economic impact strategy 2020 updateGOV.UK Content API ↗
- 2020-02-14 · consultation_closedNuclear Decommissioning Authority: Business Plan 2020 to 2023GOV.UK Content API ↗
- 2020-01-31 · consultation_openedNDA local social and economic impact strategy 2020 updateGOV.UK Content API ↗
- 2019-12-23 · consultation_openedNuclear Decommissioning Authority: Business Plan 2020 to 2023GOV.UK Content API ↗
- 2019-11-01 · publicationAnnouncement of Opportunity: Nuclear Decommissioning Space Data ChallengeThe UK Space Agency invites proposals for ideas utilising satellite Earth observation (EO) data to enable solutions for asset management challenges on nuclear decommissioning sites.GOV.UK Search API ↗
- 2019-03-29 · government_responseNuclear Decommissioning Authority: Business Plan 2019 to 2022GOV.UK Content API ↗
- 2019-03-14 · publicationManaging on-site stockpiling and use of high volumes of concrete-based demolition materialAn independent research report conducted as part of NDA's Direct Research Portfolio (DRP).GOV.UK Search API ↗
- 2019-02-04 · consultation_closedNuclear Decommissioning Authority: Business Plan 2019 to 2022GOV.UK Content API ↗
- 2018-12-03 · consultation_openedNuclear Decommissioning Authority: Business Plan 2019 to 2022GOV.UK Content API ↗
- 2018-11-14 · consultation_closedSTEM Engagement across the NDA GroupThis paper outlines Credible Options for a Science, Technology, Engineering and Mathematics (STEM) engagement strategy across the NDA Group, considering the current environment around skills and wider issues.GOV.UK Search API ↗
- 2018-10-31 · consultation_closedNDA Radioactive Waste StrategyGOV.UK Content API ↗
- 2018-07-30 · consultation_openedNDA Radioactive Waste StrategyGOV.UK Content API ↗
- 2018-07-11 · publicationEconomic Impact Assessment of Magnox sitesAn assessment of the economic impact of the 12 Magnox sites on their local economies.GOV.UK Search API ↗
- 2018-06-20 · consultation_openedSTEM Engagement across the NDA GroupGOV.UK Content API ↗
- 2018-03-29 · government_responseNuclear Decommissioning Authority: Business Plan 2018 to 2021GOV.UK Content API ↗
- 2018-02-04 · consultation_closedNuclear Decommissioning Authority: Business Plan 2018 to 2021GOV.UK Content API ↗
- 2017-12-11 · consultation_openedNuclear Decommissioning Authority: Business Plan 2018 to 2021GOV.UK Content API ↗
- 2017-07-13 · publicationGraphene and its use in nuclear decommissioningOverview of research and development regarding the properties and potential opportunities of using graphene and related materials in nuclear decommissioning.GOV.UK Search API ↗
- 2017-03-30 · government_responseNuclear Decommissioning Authority: Business Plan 2017 to 2020GOV.UK Content API ↗
- 2017-02-03 · consultation_closedNuclear Decommissioning Authority: Business Plan 2017 to 2020GOV.UK Content API ↗
- 2016-12-12 · consultation_openedNuclear Decommissioning Authority: Business Plan 2017 to 2020GOV.UK Content API ↗
- 2016-04-01 · government_responseNuclear Decommissioning Authority: StrategyGOV.UK Content API ↗
- 2016-04-01 · government_responseNuclear Decommissioning Authority: Business Plan 2016 to 2019GOV.UK Content API ↗
- 2016-02-15 · consultation_closedNuclear Decommissioning Authority: StrategyGOV.UK Content API ↗
- 2016-02-15 · consultation_closedNuclear Decommissioning Authority: Business Plan 2016 to 2019GOV.UK Content API ↗
- 2016-01-05 · consultation_openedNuclear Decommissioning Authority: StrategyGOV.UK Content API ↗
- 2016-01-05 · consultation_openedNuclear Decommissioning Authority: Business Plan 2016 to 2019GOV.UK Content API ↗